# What is the most I can pay landed for an Amazon item at my target margin?

Subtract fulfillment, ads, other per-unit costs, referral fees and target dollar profit from the planned price. The remainder is the maximum landed cost for your target contribution margin at that price.

Canonical URL · https://knowamazon.com/answers/calculate-maximum-landed-cost-for-amazon-margin/

## On this page

- [Agent prompt](#prompt)
- [How to use it](#workflow)
- [Worked example](#example)
- [What to check before using the result](#limits)
- [Sources](#sources)
- [Related tasks](#related)

<a id="prompt"></a>

## Agent prompt

```text
Read https://knowamazon.com/answers/calculate-maximum-landed-cost-for-amazon-margin/.
What is the most I can pay landed for an Amazon item at my target margin?
Ask me for price, referral rate, fulfillment, ads, other costs and target contribution margin. Follow the worked steps and return a per-unit landed-cost ceiling and the margin check. This ceiling is for the landed cost field. Subtract inbound freight and prep from it as applicable before treating the result as the supplier's purchase-price ceiling. Label synthetic, estimated and missing values.
```

[Open unit profit calculator](https://knowamazon.com/skills/profitability/#run)

<a id="workflow"></a>

## How to use it

1. Multiply price by one minus the referral and target margin rates. Subtract the per-unit fulfillment, ads and other variable costs from that amount.  
   [Open unit profit calculator](https://knowamazon.com/skills/profitability/#run)
2. Enter the result as Landed Cost in the calculator and check that contribution divided by price reaches the target. Save the underlying assumptions with the ceiling.

[KnowAmazon capability and limitations](https://knowamazon.com/docs/compare/#compare-output)

<a id="example"></a>

## Worked example

At USD 25, with referral 15%, target 20% and fulfillment, ads and other costs totaling USD 8, the ceiling is USD 25 × 0.65 − USD 8 = USD 8.25 per unit.

<a id="limits"></a>

## What to check before using the result

This ceiling is for the landed cost field. Subtract inbound freight and prep from it as applicable before treating the result as the supplier's purchase-price ceiling.

<a id="sources"></a>

## Sources

- [A vendor demonstrates how sourcing decisions change with a target profit, margin or ROI.](https://www.reddit.com/r/RemworthResellers/comments/1y19l6s/) · Vendor-authored discussion or example
- [A seller asks how others validate whether a candidate is profitable before committing.](https://www.reddit.com/r/FulfillmentByAmazon/comments/1solfwh/) · Seller or developer discussion
- [Amazon's FBA and merchant fulfillment fee estimator](https://sell.amazon.com/pricing/estimate)
- [KnowAmazon capability and limitations](https://knowamazon.com/docs/compare/#compare-output)

<a id="related"></a>

## Related tasks

- [At $24.99, what is my Amazon FBA contribution and break-even price?](https://knowamazon.com/answers/calculate-amazon-break-even-selling-price/)
- [How to compare FBA and FBM profit for the same Amazon item](https://knowamazon.com/guides/compare-amazon-fba-and-fbm-unit-profit/)

[Open unit profit calculator](https://knowamazon.com/skills/profitability/#run)
